Trappes
A complete renovation of the warehouse located at 10 Avenue des Frères Lumières in Trappes was completed in 2023. The above photos show the building before and after the works.
A key deliverable throughout the renovation was the enhancement of building performance and energy efficiency, by identifying and implementing a range of efficiency measures, as detailed below.
- Maximisation of natural lighting to reduce use of artificial lighting through the installation of additional windows and use of white paint in interior walls.
- Installation of electric vehicle charging ports to support uptake of low carbon transportation.
- Installation of high-efficiency LED lighting throughout the warehouse to further reduce energy consumption.
- Whole-building fabric insulation refits and upgrades to improve energy and indoor environmental performance.
- Upgrade to a more energy-efficient heating system, reducing energy demand.
- Encouraged recycling and waste reduction through raising awareness with our GC.
- Implementation of a BMS to control the building’s energy consumption.